How Does Export Logistics for Used Excavators Work? Sanqi Machinery Breaks Down the Full Port Customs Clearance and Delivery Process

From Tianjin Port to African Mining Sites, a Used Excavator's Cross-Border Delivery Must Pass Through Several Checkpoints—The Costs and Time Involved Are Worth Calculating Clearly.

Category: Corporate News Author: 三骑机械编辑部 Date: 2026-10-06 08:16 Views: 129
How Does Export Logistics for Used Excavators Work? Sanqi Machinery Breaks Down the Full Port Customs Clearance and Delivery Process

The logistics cost of exporting used construction machinery typically accounts for 8% to 18% of the equipment's transaction price, and for landlocked African countries and some South American countries, it can even exceed 25%. To deliver the goods smoothly to the customer, the key lies not in the shipping schedule itself, but in the pre-port inspection and refurbishment, whether the customs declaration documents are complete, and whether the destination port customs broker is reliable. After years of experience, Sanqi Machinery's deepest realization is: logistics is not a transportation problem, it is a process problem.

Global Logistics Capabilities: Three Main Channels

Currently, domestic exports of used construction machinery mainly use two methods: breakbulk vessels and flat racks. For a 20-ton used excavator, shipping in a 40-foot flat rack is relatively common, and Tianjin Port, Shanghai Port, and Qingdao Port can all handle it; for used bulldozers and mining trucks over 35 tons, most go by breakbulk vessel, with relatively dense schedules at Guangzhou Nansha, Lianyungang, and Rizhao Ports.

How Does Export Logistics for Used Excavators Work? Sanqi Machinery Breaks Down the Full Port Customs Clearance and Delivery Process

  • Southeast Asia Route: Jakarta, Indonesia; Ho Chi Minh, Vietnam; Manila, Philippines. Sea transit time is 7 to 15 days, and customs clearance is relatively relaxed. However, Indonesia has requirements on equipment age, so for machines older than 2015, it is necessary to confirm in advance whether they can be imported.
  • Africa Route: Dar es Salaam, Tanzania; Mombasa, Kenya; Lagos, Nigeria. Shipping time is 25 to 40 days. East African ports are more efficient than West African ones, and Dar es Salaam is currently the smoothest port for used excavators entering East Africa.
  • Central Asia and Russia Route: Via Khorgos and Alashankou by land, or via Lianyungang then rail to Almaty, Kazakhstan. Transit time is 12 to 20 days, suitable for used loaders and small to medium-tonnage excavators.

Port Customs Clearance: Documents Are More Important Than Price

On the export declaration side, used equipment requires two additional procedures compared to new machines: first, pre-shipment inspection; second, export license. Used mechanical and electrical products generally do not require commodity inspection for export, but some newer equipment may be required to provide a condition statement. Sanqi Machinery's operating practice is to issue a bilingual Chinese-English inspection report before the equipment enters the port, clearly stating the engine hours, hydraulic system pressure data, and undercarriage wear conditions, which can reduce many disputes during destination port customs clearance.

Common document checklist includes: commercial invoice, packing list, sales contract, certificate of origin, equipment inspection report, and ocean bill of lading. Some African countries also require a CTN number or electronic cargo tracking note. Nigeria, Angola, and the Democratic Republic of the Congo have similar regulations. Missing one number means the goods will be held up upon arrival at port.

Delivery Process: From Port Consolidation to On-Site Handover

For a complete delivery process, Sanqi Machinery usually breaks it down into six steps:

  • Equipment inspection and refurbishment: cleaning, touch-up painting, replacement of wear parts, and if necessary, replacement of hydraulic parts and engine components to ensure normal startup and travel before loading.
  • Booking and port consolidation: select container type or breakbulk space based on equipment dimensions and weight, and deliver the equipment to the designated port area 7 to 10 days in advance.
  • Customs declaration and release: document submission, inspection, and release, normally 2 to 3 working days, and may extend to 5 days if inspection occurs.
  • Ocean freight tracking: update vessel position weekly after bill of lading issuance, and notify the destination port agent 7 days before arrival to prepare for customs clearance.
  • Destination port customs clearance: pay tariffs and value-added tax, process delivery order. Customs clearance in African countries generally takes 7 to 20 days.
  • On-site handover: arrange trailer delivery to the job site, complete startup testing, operator training, and sign the handover sheet.

Cost Structure and Regional Market Conditions

Taking a 20-ton used excavator exported to East Africa as an example, ocean freight plus port miscellaneous charges are roughly between USD 3,500 and USD 6,000, depending on the shipping company's peak and off-peak seasons. Destination port customs clearance fees vary greatly: Tanzania is about USD 1,500 to USD 2,500, while Nigeria may exceed USD 3,000. Central Asia land transport costs are calculated per railcar; for one excavator from Khorgos to Almaty, the freight is about USD 4,000 to USD 7,000.

The most frequently asked question from buyers is the "landed price." This figure must include the equipment payment, inspection and refurbishment fees, domestic transport, ocean freight, insurance, destination port customs clearance, and inland trucking. When quoting customers, Sanqi Machinery habitually lists these seven items separately, making it clear at a glance which item can be saved and which cannot.

Frequently Asked Questions (FAQ)

What customs clearance documents are generally required for exporting used excavators?

Usually required are commercial invoice, packing list, sales contract, certificate of origin, equipment inspection report, and ocean bill of lading. Some African countries also require a CTN or electronic cargo tracking note. The specific requirements are subject to confirmation by the destination port agent.

What percentage of the equipment price does the logistics cost of exporting used construction machinery generally account for?

For short-sea routes, it generally accounts for 8% to 12%, and for African and South American routes, 15% to 25%. Breakbulk vessels are cheaper than flat racks, but have fewer schedules and longer waiting times, so a trade-off is needed.

How long does destination port customs clearance generally take?

Southeast Asia usually takes 3 to 7 days, East Africa 7 to 15 days, and West Africa and some landlocked countries may take 15 to 30 days. If documents are complete and tariffs are paid in advance, the time can be reduced by one-third.

What should be noted when shipping used bulldozers and mining trucks by breakbulk vessel?

For over-width and over-height equipment, the ship's lifting gear capacity must be confirmed in advance. For mining trucks, it is recommended to disassemble some components to reduce height. Lashing and securing must use a scheme approved by the shipowner; otherwise, the insurance company may refuse to pay claims.

What should be done if hydraulic parts or engine components are found damaged after the equipment arrives at port?

Taking photos before shipment for records and purchasing sufficient marine insurance are key. Sanqi Machinery has cooperative service points at destination ports, and common hydraulic parts and engine components can be replaced locally, avoiding long-term equipment downtime.

Do exported used equipment require pre-shipment inspection?

Most used mechanical and electrical products do not require mandatory commodity inspection for export, but newer equipment may be required to provide a condition statement. Preparing a bilingual Chinese-English inspection report in advance can reduce trouble in customs declaration and destination port clearance.