How Does the Procurement Process for Used Excavators and Loaders Work? A Full Breakdown of Sanqi Machinery Platform's Payment, Logistics, and After-Sales Support

From inquiry to delivery to spare parts supply, how does the one-stop service actually work? This article tells you all you need to know.

Category: Corporate News Author: 三骑机械编辑部 Date: 2026-09-12 08:15 Views: 45
How Does the Procurement Process for Used Excavators and Loaders Work? A Full Breakdown of Sanqi Machinery Platform's Payment, Logistics, and After-Sales Support

To avoid pitfalls in used construction machinery procurement, the core lies in three things: equipment sources must be traceable, payment milestones must be tied to inspection reports, and after-sales spare parts must have someone responsible. Sanqi Machinery (83777.cn) breaks the process into six steps: inquiry, inspection, contract signing, payment, logistics, and after-sales. Used excavators, used loaders, and mining trucks all follow the same set of standards, with export orders adding customs clearance and ocean shipping.

How Does the Platform Procurement Process Work?

Many customers asking for the first time care most not about price, but about "once I transfer the money, when can I see the equipment." The platform's approach is to break the entire process into verifiable milestones, each with corresponding documentation.

How Does the Procurement Process for Used Excavators and Loaders Work? A Full Breakdown of Sanqi Machinery Platform's Payment, Logistics, and After-Sales Support

  • Requirement registration: Provide working conditions, tonnage, budget, and destination country; customer service matches in-stock equipment or overseas sources.
  • Initial equipment screening: Provide whole-machine photos, hour meter readings, year, and maintenance records to filter out obviously unsuitable machines.
  • Third-party inspection: Issue an inspection report covering engine cylinder pressure, hydraulic system pressure, travel and swing functions, and structural welding repairs.
  • Video inspection: Support real-time video viewing and trial operation, focusing on cold starts, engine bogging, and movement speed.
  • Contract signing: Specify equipment number, configuration, price, delivery time, warranty scope, and dispute resolution methods.
  • Payment and shipping: Pay by milestones; after final payment is settled, arrange domestic transportation or export customs clearance.

Domestic orders typically complete delivery in 7 to 15 days, while export orders generally take 20 to 40 days due to customs clearance and shipping schedules. Southeast Asia, Africa, and the Middle East are the main destinations, with Russia and Central Asia also showing significant growth in recent years.

Payment Methods and Risk Control

Payment is the stage where disputes are most concentrated. The platform currently supports three methods: corporate bank transfer, letter of credit (L/C), and telegraphic transfer (T/T). Small spare parts orders can also use platform escrow. The standard rhythm is: 30% deposit upon signing, 50% after inspection report confirmation, and 20% final payment before loading or customs clearance. For large export orders, L/C is recommended, with the inspection report and bill of lading written into the negotiation conditions.

  • The deposit ratio is generally no less than 30%; too low and you may encounter "one machine sold multiple times."
  • Try to settle the final payment before loading or container stuffing to avoid passive price increases after arrival at port.
  • For export orders, keep the customs declaration, packing list, and bill of lading for subsequent customs clearance and after-sales traceability.

Logistics Delivery and Export Customs Clearance

Domestic delivery mainly uses flatbed trailers and low-bed trailers. Cross-province freight for a 20-ton excavator is roughly 8 to 15 RMB per kilometer, depending on the route and whether an overweight permit is required. For exports, the platform handles booking, customs clearance, and container loading, with common destinations including Indonesia, the Philippines, Nigeria, Saudi Arabia, and the UAE. Breakbulk vessels are suitable for large mining trucks and bulldozers, while containers are more suitable for small and medium-sized excavators and loaders.

It should be noted that some countries have age restrictions on used Chinese machinery. For example, Indonesia has requirements for excavator age. Before export, be sure to confirm the destination country's access policies to avoid return shipments upon arrival.

After-Sales Service and Spare Parts Support

The biggest fear with used equipment is "can afford to buy but not to repair." The platform provides a three-month warranty on core components, covering the engine, hydraulic pump, distribution valve, etc., with the specific scope written into the contract. For spare parts, hydraulic parts and engine parts are mainly original factory parts, with branded aftermarket options also available. Common parts are shipped from domestic warehouses within 48 hours, while export parts go by air freight or consolidated container.

  • During the warranty period, non-human-caused failures are covered by remote guidance or local service provider visits.
  • For wearing parts such as bucket teeth, filters, and oil seals, it is recommended to keep a spare set with the machine.
  • Export customers can lock in a spare parts list in advance to reduce downtime waiting.

Price Reference for Mainstream Models

Market prices fluctuate with year, hours, and region. Taking the 2024-2025 domestic market as an example, mainstream prices for 20-ton used excavators range from 180,000 to 350,000 RMB, with those under 8,000 hours leaning toward the upper limit; 5-ton mini excavators range from 60,000 to 120,000 RMB; 5-ton used loaders range from 120,000 to 220,000 RMB; 220-horsepower used bulldozers range from 350,000 to 600,000 RMB; mining trucks, depending on payload and brand, range from 800,000 to 1,500,000 RMB for 40-ton class. Export quotes also include freight, customs clearance, and destination country taxes, typically 10% to 25% higher than domestic prices.

FAQ

What are the most important things to check when purchasing a used excavator?

Focus on engine cylinder pressure, hydraulic system pressure, whether there are abnormal noises in swing and travel, and whether there is welding repair on the boom and undercarriage. With both an inspection report and a trial operation video, you can basically avoid machines with major accidents.

What payment methods are supported for platform procurement?

Corporate bank transfer, T/T, and L/C are supported, and small orders can use platform escrow. The standard payment is by milestones: 30% deposit, 50% upon inspection confirmation, and 20% before loading.

What documents are needed for exporting used construction machinery?

Contract, invoice, packing list, customs declaration, and bill of lading are required. Some countries also require an inspection report and certificate of origin. It is recommended to confirm the destination country's restrictions on machine age and emissions in advance.

How long does after-sales warranty generally cover?

Core components are usually warranted for three months, covering the engine, hydraulic pump, and distribution valve. Wearing parts are not covered, and it is recommended to keep a spare set of bucket teeth, filters, and oil seals with the machine.

How long does it take for hydraulic parts and engine parts to arrive?

Common domestic parts are shipped within 48 hours, while less common parts generally take 5 to 7 days. Export parts by air freight take about 7 to 12 days, while consolidated container shipments follow the next vessel schedule.

Share: Weibo QZone Copy Link 👁 45 views

Post Comment 1

老码头 Member 2026-09-12 02:57 #1 Reply
I've used similar models before. How does the procurement process work for used excavators and loaders? Sanqi Machinery platform's full breakdown of payment, logistics, and after-sales support—this model has always had a good reputation.
Write your comment
Comments are moderated before publishing

Related Reading