How Does the Platform Procurement Process for Used Excavators Work? A Full Breakdown of Payment, Logistics, and After-Sales Support

From Machine Selection to Delivery, Sanqi Machinery Breaks Procurement into Four Steps, Each with a Fallback Plan.

Category: Corporate News Author: 三骑机械编辑部 Date: 2026-10-24 08:15 Views: 35
How Does the Platform Procurement Process for Used Excavators Work? A Full Breakdown of Payment, Logistics, and After-Sales Support

When procuring used construction machinery through a platform, the core comes down to three things: inspection that can be seen, payment with milestones, and delivery with someone accountable. Sanqi Machinery's approach is to divide an order into four stages: machine selection and inspection, contract signing and payment, logistics and delivery, and after-sales parts. Each stage has written records and fallback plans, so buyers do not have to gamble hundreds of thousands of yuan on a machine based on "trust."

Why Platform Procurement Is Becoming More Common

Domestic excavator ownership is large, but second-hand circulation has long relied on introductions through acquaintances, with opaque pricing and machine condition described only by word of mouth. In the past two years, exporters and overseas job-site buyers have been more willing to use platforms, because inspection reports, contracting entities, and logistics documents can be matched up. Taking 20-ton-class used excavators as an example, supply is concentrated in Jiangsu and Shandong. Platform quotes for machines of the same year are usually 3% to 8% higher than offline individual sellers, but they include inspection records for the undercarriage, hydraulics, and engine. For buyers across provinces or even across borders, that price difference is worth paying.

How Does the Platform Procurement Process for Used Excavators Work? A Full Breakdown of Payment, Logistics, and After-Sales Support

The Four-Step Procurement Process

  • Machine selection and inspection: Submit working-condition requirements (earthmoving, mining, municipal). The platform screens machines by tonnage and budget and provides full-machine photos, hour-meter readings, hydraulic system pressure tests, and engine smoke videos. A third-party re-inspection can be arranged if necessary.
  • Contract signing and payment: After confirming machine condition, sign a purchase and sales contract specifying model, hours, delivery port, and acceptance standards. The deposit is generally 30%, and the balance is paid against the bill of lading or after passing inspection.
  • Logistics and delivery: Whole machines are shipped by break-bulk vessel or flat rack. Southeast Asia takes 7 to 12 days, the Middle East 18 to 25 days, and the West Coast of Africa around 30 days, including customs declaration, securing, and insurance.
  • After-sales parts: After delivery, operating and maintenance recommendations are provided. Hydraulic pumps, travel motors, and engine parts are supplied by original part number, with common parts shipped in 3 to 7 days.

How to Choose a Payment Method

RMB corporate transfer is suitable for domestic pickup and bonded-zone delivery; shipment is arranged once funds arrive. USD wire transfer is the most commonly used method for export orders. For the balance, a sight letter of credit is recommended, with inspection reports and loading photos attached to the documents to reduce disputes during bank document review. For parts orders of small amounts, platform escrow can be used directly, with funds released after goods arrive and are confirmed. One reminder: do not accept any "discounted price" that requires payment to a private account. On a legitimate platform, the contracting entity and the receiving account must be consistent.

The Detailed Accounting of Logistics and Delivery

Used bulldozers and wheel loaders are bulky. Before sea shipment, tracks and buckets must be reinforced, and exposed parts of hydraulic cylinders must be wrapped to prevent salt-spray corrosion. Southeast Asian routes have dense schedules and stable prices; sea freight for a 20-ton excavator to Jakarta is roughly USD 1,200 to 1,800. African routes fluctuate greatly due to transshipment, so allow a one-week buffer before booking space. Documents accompanying delivery include the bill of lading, invoice, packing list, certificate of origin, and inspection report. Missing any one of them can cause delays at the destination port.

What Makes After-Sales Support Work

The biggest fear with used equipment is "losing contact" after delivery. Platform support has two layers. The first is parts: relying on original-parts channels, hydraulic parts and engine parts are matched by model and part number to avoid aftermarket parts that do not fit. The second is service: overseas service points or partner repairers are set up in major export markets, solutions for common faults are provided within 48 hours, and major component replacements are replenished by air freight. The warranty scope is clearly stated in the contract, usually 30 days or 500 hours for the whole machine, with separate terms for the main hydraulic pump and engine cylinder block.

Frequently Asked Questions

How can I confirm the real condition of a used excavator bought through a platform?

Require full-machine video, hour-meter readings, hydraulic pressure tests, and engine smoke records. For high-value orders, a third-party re-inspection can be commissioned. The cost is generally borne by the buyer and can be negotiated as a deduction after the deal is concluded.

How much deposit is usually paid for procuring used construction machinery?

Industry practice is a deposit of about 30%, with the balance paid against the bill of lading or after passing inspection. For export orders, a sight letter of credit is recommended for the balance; for domestic orders, corporate transfer can be used. Avoid paying to private accounts.

How long and how much does sea freight take for exporting used wheel loaders?

Major Southeast Asian ports take 7 to 12 days, with sea freight for 20-ton-class equipment at about USD 1,200 to 1,800; the Middle East takes 18 to 25 days, and the West Coast of Africa about 30 days, depending on sailing schedule and securing requirements.

What should I do if hydraulic parts break down after delivery?

Report the model and part number to the platform. Common hydraulic pumps and travel motors are shipped in 3 to 7 days, and urgent parts go by air. The contractual warranty period is usually 30 days or 500 hours, with separate terms for the main pump and engine parts.

Can mining trucks and bulldozers also follow the same process?

Yes, the process is the same, but mining trucks are larger in tonnage, so the destination port's unloading capacity and flatbed transfer plan must be confirmed in advance. Logistics time should include an extra 5 to 10 days compared with excavators.